How we work

Four steps, no surprises.

The same order every time, whether it’s a flat in Larnaca or a production line. Here’s what each stage actually involves — including the parts most companies leave out.

  1. 01

    Listen

    We come to the space and ask what isn’t working. Not which system you want — what’s actually getting in the way, day to day. No specification, no product names, no laptop. And if we think automation is the wrong answer for your problem, this is where we say so.

    What we need
    An hour, and whoever actually uses the space.
    How long
    One visit.
  2. 02

    Design

    You get a plan in plain language, a fixed price, and a timeline. It says what goes where, what it does, and what it costs — with nothing on it you didn’t ask about. If something you wanted turns out to cost more than it’s worth, we’ll tell you and let you decide, rather than quietly leaving it in.

    What we need
    Drawings if you have them. If you don’t, we’ll measure.
    How long
    Usually one to two weeks from the visit.
  3. 03

    Install

    We work around you. The panel goes in first, then the rooms. You get dates in writing, and a phone call if they move. We clean up at the end of each day rather than at the end of the job, because you have to live or work in the space in between.

    What we need
    Access, and somewhere to put a panel.
    How long
    Days for a flat, weeks for a building. It’s on the plan.
  4. 04

    Stay

    A training session with everyone who’ll touch the system, not just whoever signed the contract. A documentation pack. Then the same number to call in year five — and the same people answering it.

    What we need
    An hour on handover day.
    How long
    For as long as the system is in.

After the handover

The part nobody puts in a brochure

This is where automation projects usually go wrong. Not during the install — two years later, when something needs changing and the person who built it has moved on.

  • You get the documentation

    Drawings, addresses, credentials, backups. Everything a competent engineer would need to pick your system up without ever having met us. It’s yours, not ours.

  • We build on open standards

    KNX, Modbus, BACnet — over proprietary systems wherever there is a choice. It means you’re not locked to us. That’s deliberate, and it’s the honest answer to the question people are usually too polite to ask.

  • Changing something later

    Adjusting a scene or a schedule is something you do yourself, and we show you how on handover day. Adding hardware is a call-out. We’ll tell you which one it is before we come out. [PLACEHOLDER — callout rates.]

  • When something breaks

    Most faults are visible remotely and fixed the same day. When they’re not, you get a written response time rather than a promise on a website. [PLACEHOLDER — real response commitments.]

Start with the first step.

The visit costs nothing and commits you to nothing.

Arrange a visit